Transport Canada’s Arctic Drone Project Delayed 2 years by Arms-Control Rules
By The Editor
Transport Canada’s plan to patrol the Arctic with a drone has been delayed by at least two years, partly because the unmanned aircraft is so large it’s considered a kind of missile and falls under complex arms-control rules. The $39.5-million project, approved June 2015, was supposed to see a drone
Read Full Article Here
For more great articles: UAS VISION
(Visited 11 times, 1 visits today)